The Paks NPP is the only operating four-unit nuclear power plant in Hungary, built on the basis of the Soviet design with VVER-440 reactors. Currently, preparatory works are underway for the construction of the fifth and sixth power units (Paks II NPP) with reactors based on the Russian VVER-1200 technology of the 3+ generation, in which JSC Siltumelektroprojekts takes an active part.

Works performed:

  • Development of design and detailed design documentation
  • Development of the construction organization plan
  • Development of the work execution design
  • Performance of works on designer supervision

Gallery

A four-unit nuclear power plant under construction on the northern coast of Egypt, 3.5 km from the Mediterranean Sea near the city of El Alamein, with VVER-1200 reactors of the “3+” generation and a desalination complex. It is the first nuclear power plant in Egypt.

Works performed:

  • Development of design and detailed design documentation
  • Development of the construction organization plan
  • Development of the work execution design
  • Performance of works on designer supervision

Gallery

A four-unit nuclear power plant under construction on the Mediterranean coast of Turkey in the Mersin Province with VVER-1200 reactors of the 3+ generation. The first project in the nuclear industry implemented on the basis of the BOO model (Build - Own - Operate).

Works performed:

  • Development of design and detailed design documentation
  • Development of the construction organization plan
  • Development of the work execution design
  • Engineering and geodetic surveys
  • Performance of works on designer supervision

Gallery

A single-unit nuclear power plant under design located on the eastern shore of the Gulf of Bothnia of the Baltic Sea in the municipality of Pyhäjoki (Finland) with a Russian- designed VVER-1200 reactor of the new generation “3+”. The design of the nuclear power plant complies with IAEA and EU standards and is adapted to Finnish national safety requirements, which, according to experts, are the most stringent in the world.

Works performed:

  • Development of design and detailed design documentation
  • Development of the construction organization plan
  • Development of the work execution design
  • Engineering and geodetic surveys
  • Performance of works on designer supervision

Gallery

This site is registered on wpml.org as a development site.